03 February 2008

More Kitchen

We're finally laying tile - for real!

Drew started with the edging tiles. Once those are set and level, we'll work back from there. The boys are continuing to cut strips for the front vertical edging. They're also working on some of the other diagonal cuts we'll need for the back wall.

It's starting to look like a counter!

Drew also decided that the groutline from the 1/16" spacers was too big, so we're eyeballing our groutlines and they're closer to 1/32". The won't be perfect, but Drew's working with straight edges so we hope to have minimum drifting. Also, the tiles are manufactured to fairly tight specs, which means we don't have to have larger groutlines to compensate for lopsided tiles.

SDG!